第1章 进度管理计算题 ······································································1
1.1 单代号网络图 ················································································1
1.1.1 知识点回顾 ·····················································································1
1.1.2 历年试题解析 ··················································································2
1.2 双代号网络图 ················································································4
1.2.1 知识点回顾 ·····················································································4
1.2.2 历年试题解析 ··················································································5
1.3 关键路径法 ···················································································6
1.3.1 知识点回顾 ·····················································································6
1.3.2 历年试题解析 ··················································································8
1.4 进度压缩 ·····················································································14
1.4.1 知识点回顾 ···················································································14
1.4.2 历年试题解析 ················································································14
1.5 资源优化 ·····················································································18
1.5.1 知识点回顾 ···················································································18
1.5.2 历年试题解析 ················································································19
1.6 PERT估算 ···················································································22
1.6.1 知识点回顾 ···················································································22
1.6.2 历年试题解析 ················································································23
1.7 进度估算 ·····················································································28
1.7.1 知识点回顾 ···················································································28
1.7.2 历年试题解析 ················································································28
1.8 进度综合案例 ···············································································33
1.8.1 (2009上半年,下午)试题二···························································33
1.8.2 (2011下半年,下午)试题二 ···························································35
1.8.3 (2013上半年,下午)试题二···························································37
·VI·
第2章成本管理计算题 ···································································· 40
2.1 成本类型 ·····················································································40
2.1.1 知识点回顾 ··················································································· 40
2.1.2 历年试题解析 ················································································ 40
2.2 成本估算 ·····················································································45
2.2.1 知识点回顾 ··················································································· 45
2.2.2 历年试题解析 ················································································ 46
2.3 成本预算 ·····················································································50
2.3.1 知识点回顾 ··················································································· 50
2.3.2 历年试题解析 ················································································ 51
2.4 挣值管理 ·····················································································55
2.4.1 知识点回顾 ··················································································· 55
2.4.2 历年试题解析 ················································································ 59
2.5 成本预测 ·····················································································68
2.5.1 知识点回顾 ··················································································· 68
2.5.2 历年试题解析 ················································································ 69
2.6 成本综合案例 ···············································································72
2.6.1 (2009下半年,下午)试题四··························································· 73
2.6.2 (2010上半年,下午)试题二··························································· 74
2.6.3 (2010下半年,下午)试题二 ·························································· 75
2.6.4 (2011 上半年,下午)试题二 ··························································· 77
2.6.5 (2012下半年,下午)试题三··························································· 79
2.6.6 (2013下半年,下午)试题四··························································· 85
2.6.7 (2014上半年,下午)试题四··························································· 87
第3章进度成本综合案例题 ······························································ 89
3.1 (2012上半年,下午)试题二 ··························································89
3.2 (2014下半年,下午)试题一 ··························································92
3.3 (2015上半年,下午)试题一 ··························································94
3.4 (2015下半年,下午)试题四 ··························································98
·VII·
第4章风险管理计算题 ···································································103
第5章招标采购计算题 ···································································108
5.1 历年试题解析 ············································································· 108
5.2 综合案例 ··················································································· 120
5.2.1 (2009下半年,下午)试题一··························································120
5.2.2 (2013下半年,下午)试题二··························································122
5.2.3 (2015下半年,下午)试题一··························································123
第6章立项管理计算题 ···································································125
第7章信息技术计算题 ···································································129
第8章集成资质计算题 ···································································139